Staff Productivity Report.
In this guide, users will learn how to utilize the Staff Productivity Report to pull the number of “productive” hours a staff member worked for a given time period. This report will break down those “productive” hours into hours contributed to both billable and payroll hours.
Step | Description | Helpful Information |
---|---|---|
Navigating to the Staff Productivity Report | Reporting>Scheduling>Staff Productivity |
|
Generating the Staff Productivity Report | Utilize the filters at the top of the report to filter down criteria, as needed, or leave blank to generate all possible information. Select Update and/or Export to Excel when finished. Refer to the list below for information on what each column will generate:
| Note: accurate data is dependent on the staff member’s availability. Please ensure each staff member’s availability is set up in their staff profile before generating this report. Billable/Available % Example:
Billable/Payable % Example:
|